Wattilla
Demo listingThis is an example of how a BESS listing can be presented on Wattilla.
Create your own listing
Service

BESS Project Finance & Structuring gsjns

Netherlands hds · Amsterdam hf
Asking price: Nsjsb
Asking price
Nsjsb

Description

Energy storage finance advisory boutique. Services: debt structuring for BESS projects (senior, mezzanine), equity placement, revenue contract review, lender technical advisory, financial model audit. Closed €320M in storage financings across EU. Network includes 15+ active infrastructure lenders with storage mandates. Mandates from 20 MW upwards.

Posted 3 Jul 2026

Financial Overview

Asking price
Nsjsb

Contact details are hidden

Sign in to view contact information and send a message.

Email address
Send a message

Related listings

BESS: MW

Chaolin New Energy invests in, builds and operates commercial and industrial rooftop solar and battery energy storage projects in China. Under EMC agreements, factories get green power and lower electricity bills with zero upfront investment. Chaolin holds 50+ MW of self-owned solar plants and helps manage 300+ MW of fund projects. Legal name: Shanghai Chaolingsheng New Energy Technology Co., Ltd. Address: 5F, Building 17, Peninsula Science & Technology Park, 88 Darwin Road, Pudong New Area, Shanghai 201203, China Founded: 2021 Team: about 20 people Type: C&I rooftop solar and battery storage developer, investor, EPC and O&M (not a manufacturer) Contact: Alwin Xiong, Partner

EPCO&M
2 weeks ago
BESS: MW

Elevat Solar Consulting is an owner-side technical advisory practice working across eight Southeast European markets: Bulgaria, Romania, Greece, Serbia, Croatia, Slovenia, North Macedonia and Bosnia and Herzegovina. Advisory portfolio to date is over 400 MWp. We work for the buyer, the owner and the lender. We do not sell equipment and we take no commission from suppliers, so the assessment you receive carries no commercial interest in the outcome. **Services** - Technical due diligence on PV, BESS and hybrid assets, at development, ready-to-build or operating stage. - Owner's Engineer on the investor side, through design, construction and commissioning. - EPC management and contract scope review. - Procurement support: specification, tender documents, comparison of supplier offers, factory and site acceptance criteria. - Grid connection procedure in Bulgaria, under Ordinance No 6 of 28.03.2024, including storage and hybrid configurations. - Rooftop mounting structures and installation, where we act as executor. Reports state their assumptions by name, mark every power figure as DC or AC, and close with a recommendation rather than a summary. Working languages: English and Bulgarian.

BESS ConsultingTechnical Due DiligenceEngineering
2 weeks ago
BESS: MW

Cut the time from questions to decisions you can act on: Dactana lets your energy teams ask business questions in their own words and get answers in minutes, not weeks. Every figure is independently verified before it reaches your board and your data never leaves your warehouse. Findings become assigned, tracked actions with the evidence attached. Faster decisions, fewer analyst bottlenecks and numbers you can stand behind.

BESS ConsultingO&MEngineering
4 weeks ago

On Request

BESS: MW

Investors, developers and technical advisers often receive fragmented BESS evidence across data rooms, emails, studies, permits and public records — with no one layer reconciling it before senior specialists get involved. BiP Omega prepares that documentary and evidence layer before legal counsel, grid engineers, Independent Engineers or investment committees issue their substantive conclusions. It is independent, document-based pre-investment screening — upstream of specialist judgment, not a substitute for it. **When it enters** Before an LOI, before an acquisition price is set, and before a full diligence budget is committed — or as prepared input alongside a specialist's own review. **What the client receives** Depending on scope: evidence inventory, source provenance, document and version reconciliation, chronology and temporal-validity checks, a structured contradiction and gap register, materiality assessment, prioritized RFIs, and a specialist-ready handoff with source-linked findings. **What this does not substitute** - Not legal due diligence — no legal opinion is issued. - Not an Independent Engineer engagement, a bankability certification, or a code-compliance sign-off. - Not independent grid feasibility or power-flow modelling — no determination of available capacity or connection outcome. - No site visits, factory audits or field verification — the review is exclusively document-based. The client's own legal, grid, engineering or investment specialists retain the substantive professional conclusions. **Scope options** 1. BESS Red-Flag Screen — priority documentary domains: site control / land / lease evidence, zoning and planning, environmental decisions, permitting, project-company/SPV documentation, and data-room/public-source reconciliation. 2. Grid Connection Evidence & Study-Readiness Dossier — DSO/TSO/GPZ/POI documentary evidence, connection applications and conditions, grid correspondence, and temporal reconciliation of studies already provided. Excludes power-flow modelling, independent grid-feasibility determination, and any definitive capacity or connection conclusion. 3. Full Pre-Investment BESS Screen — integrates the domains above into one structured, traceable, source-linked record, within the same limits. **Who this is for** Investors, developers, buyers, Independent Engineers, Technical Advisers, Lenders' Technical Advisers, transaction advisers, and BESS consultancies needing external documentary capacity or diligence overflow. **Delivery model** BiP Omega is based in Tampico, Tamaulipas, Mexico, and delivers remotely on international mandates — directly for investors and developers, or as external documentary capacity (overflow / white-label) for consultancies and specialist firms. No exclusivity implied or required. Project-based / scoped engagement: fixed fee set once scope, evidence volume and review objective are defined. **How to start a scope** Send the project location, approximate MW/MWh, project stage, review objective and approximate document/data-room volume. BiP Omega will return a proposed documentary scope and fee by email — no calls required.

BESS ConsultingTechnical Due Diligence
6 weeks ago