Wattilla
← Back to requests
Equipment RequestOpen

Tender: 1× containerised BESS 1.25 MW / 2.5 MWh — LFP, liquid cooling, 20 ft, in stock in Europe

UkraineDeadline: Deadline passed
Description

We are looking for an all-in-one containerised BESS for a C&I / microgrid project in Zhytomyr (Ukraine). Priority: delivery from stock in Europe (ready units or short lead time from a European warehouse).

System

  • 1× 20 ft all-in-one container, LFP (grade A cells), liquid cooling with heating, IP55, corrosion protection C4
  • AC power 1.25 MW (cos φ > 0.99), usable energy ≥ 2.5 MWh BOL @25 °C, 2 h, C-rate ≤ 0.5C
  • Cycle life ≥ 8000 cycles to 70 % SOH; RTE ≥ 0.87; discharge efficiency at POC ≥ 0.92 (incl. auxiliaries)
  • Output 400 V AC, 50 Hz, 3P3W; 1250 kVA / 6 kV transformer as part of the system if required
  • Automatic fire detection and suppression
  • Container-level EMS + BMS with cell balancing, SCADA; RS485 and Ethernet; aggregator interface (optional)
  • Island / backup mode and black start required; grid-forming to be agreed with supplier

Application

  • Behind-the-meter at consumer LV 0.4 kV (6 kV grid): energy arbitrage (Ukrainian DAM / IDM), peak shaving, backup for critical loads, possible PV self-consumption

Scope

  • Base scope: battery system, PCS and LV switchgear, transformer, EMS, auxiliary systems and fire protection, FAT/SAT and commissioning
  • Please quote as options: engineering (SLD, GA, grid-code support), transport and unloading, installation and electrical integration, O&M / LTSA, training, spare parts
  • Foundations, civil works, cables and fencing: by Client / EPC

Other requirements

  • Delivery DAP Zhytomyr (Incoterms 2020); delivery to Ukraine under martial law (logistics, insurance)
  • Certificates: IEC 62619, IEC 63056, IEC 61000, UN38.3
  • Operation down to −20 °C (container range −20…+55 °C, altitude ≤ 2000 m)
  • Warranty: product + capacity retention (8000 cycles / 70 % SOH); service: remote monitoring, spare parts kit, training
  • Target COD: 2026-12-31 (indicative)

Please state in your offer: price, technical data sheet, stock availability / lead time, shipping weight and crane requirements, warranty and service terms. Evaluation: multi-criteria (price, technical parameters, lead time, warranty, service).

Posted 3 November 2026

Equipment requirements

Key specifications
Units
1pcs
Min. power
1250kW AC
Min. capacity
2.5MWh
Min. cycles
8000cycles
Technology
LFP
Cooling
Liquid cooling
IP rating
IP55
Operating temperature
Min.
-20°C
Max.
55°C
Requirements
✓Fire suppression
✓PCS included
✓Certifications: IEC 62619, UN 38.3
Delivery
Incoterms
EXW
Destination
EU
Additional equipment in scope

1250 kVA / 6 kV transformer (0.4 kV output) as part of the system, if required; LV switchgear; EMS/SCADA with aggregator interface (optional)