4 MW 8 or 16 MWh in Urziceni Romania with land ownership fully RtB
Technical Parameters
Description
Project is fully ready to build including g land ownership. Grid connection contract signed including building permit.
Grid connection cost 125000 euro.
Posted 21 Nov 2026
Financial Overview
Grid Connection
BankableStep 5 of 7 — Agreement signed
Timeline
Contact details are hidden
Sign in to view contact information and send a message.
Related listings
Project is fully RtB and construction can immediately start. Potential PPA secured for 5-8 years. Low grid connection cost no reinforcement
The budget is ready to build all permits in place including building permit cabling.
20MW / 40MWh Battery Energy Storage Project – Leighton Hall, Cheshire, UK An opportunity to acquire a proposed 20MW / 40MWh (2-hour) Battery Energy Storage System (BESS) development located at Leighton Hall in Cheshire, England. Project Overview: Location: Leighton Hall, Cheshire, UK Power Capacity: 20MW Energy Storage Capacity: 40MWh Storage Duration: 2 hours Grid Connection: Proposed 33kV connection with SP Energy Networks, subject to the relevant connection works Planning: Planning permission granted for battery storage development Land: 25-year registered lease arrangement Opportunity: Acquisition of the project for further development
The seller. is offering development rights / a participation Wind Park, a 149 MW licensed wind project located in Burgas region in Bulgaria . The project has an electricity-production licence, secured land, approved detailed development plans, and historical permitting documentation.