45.6 MWp Solar & 90 MWh BESS fully RTB in Avram Iancu Romania

Romania · Avram
Asking price: €5,000,000
Power
45.6 MW
CAPEX
€24M
Asking price
€5,000,000
Target COD
Apr 2028
Payback
4 years

Technical Parameters

Solar
45.6 MW powerBrands and technology to be defined by shareholder
Grid Voltage
110 kV
Land Area
48 ha

Energy storage

BESS potential

Expected size: 90–180 MWh · 45 MW

Process started to modify the ATR and integrate BESS

Description

Project is fully RtB and construction can immediately start. Potential PPA secured for 5-8 years.

Low grid connection cost no reinforcement

Posted 21 Nov 2026

Financial Overview

Total CAPEX
€24M
Asking price
€5,000,000

Grid Connection

Bankable

Step 5 of 7 — Agreement signed

1
2
3
4
5
6
7
Voltage
110 kV

Timeline

COD targetPlanned
Target Apr 2028

Contact details are hidden

Sign in to view contact information and send a message.

Email address
Send a message

Related listings

Solar:19.6 MW

The budget is ready to build all permits in place including building permit cabling.

FeaturedProjectReady to BuildSeeking investorBESS potential: 38–72 MWhGrid: Agreement signed
Yesterday

€2,500,000

BESS:8–166 MWh/ 2h· To be decided by investor

Project is fully ready to build including g land ownership. Grid connection contract signed including building permit. Grid connection cost 125000 euro.

ProjectReady to BuildSeeking investorCOD Q3 2027Grid: Agreement signed
Yesterday

€200,000

BESS:40 MWh/ 2h

20MW / 40MWh Battery Energy Storage Project – Leighton Hall, Cheshire, UK An opportunity to acquire a proposed 20MW / 40MWh (2-hour) Battery Energy Storage System (BESS) development located at Leighton Hall in Cheshire, England. Project Overview: Location: Leighton Hall, Cheshire, UK Power Capacity: 20MW Energy Storage Capacity: 40MWh Storage Duration: 2 hours Grid Connection: Proposed 33kV connection with SP Energy Networks, subject to the relevant connection works Planning: Planning permission granted for battery storage development Land: 25-year registered lease arrangement Opportunity: Acquisition of the project for further development

ProjectReady to Build
2 weeks ago
Wind park 149 mw -Bulgaria
Bulgaria · Burgas
Wind:149 MW

The seller. is offering development rights / a participation Wind Park, a 149 MW licensed wind project located in Burgas region in Bulgaria . The project has an electricity-production licence, secured land, approved detailed development plans, and historical permitting documentation.

ProjectPermittingBESS potential: 30–120 MWhCOD Q4 2029
3 weeks ago

Price on request