Wattilla
ProjectPermitting

NEBO — 93.5 MW BESS Development Portfolio, 7 Grid-Connected Sites in Poland

Poland · Multiple — mainly Wielkopolskie; also Kujawsko-Pomorskie (Bydgoszcz) and Lubuskie (Chwalecice)
Asking price: Price on request
Power
93.5 MW
Capacity
187–374 MWh
Asking price
Price on request
Target COD
Dec 2027

Technical Parameters

BESS
187–374 MWh capacity93.5 MW powerDuration configurable per site (2h or 4h), so total capacity lands between 187 and 374 MWh. 93.5 MW installed power; 50 MW grid connection capacity secured.
Grid Voltage
15 kV
Land Area
5.55 ha

Description

NEBO (nebo.energy) is a Warsaw-based renewable energy developer with over 7 years of market experience and more than 2.5 GW of total capacity developed across photovoltaic, wind and energy storage projects. In 2023 Nebo sold a 100 MW / 16-project solar PV portfolio to hep Global (Germany), continuing its development to Ready-to-Build stage under a development service agreement — a track record directly relevant to the type of transaction offered here.

This listing offers a portfolio of 7 stand-alone battery energy storage (BESS) development sites across Poland, presented together as a single opportunity. Combined installed power of 93.5 MW with 50 MW of grid connection capacity already secured for charging and discharging. Land is controlled at every site and grid connection conditions have been granted at all 7; at 3 of the 7 (Śmigiel, Bydgoszcz, Środa Wielkopolska), Nebo has already progressed to a signed grid connection agreement — the stronger bankability milestone. Storage duration is configurable at each site, either 2h or 4h. Every site connects into a 110/15kV GPZ substation operated by Enea or Energa, with the project itself connecting at the 15kV side. Target commercial operation date is Q3–Q4 2027, with a maximum deadline of Q4 2028 under the Grid Connection Agreement.

Site-by-site overview:

  • Śmigiel — plot 91/4, GPZ Enea Śmigiel, 0.5 ha, ~110 m to connection point. 8.1 MW installed, 3 MW connection (Phase I), up to 20 MW (Phase II). Grid connection granted, grid connection agreement signed.
  • Tuczki — plot 150, GPZ Energa Tuczki, 0.98 ha, <0.5 km to connection point. 2 MW installed, 2 MW connection. Grid connection granted.
  • Bydgoszcz — plot 12/13, GPZ Enea Bydgoszcz, 1 ha, 400 m to connection point. 8.1 MW installed, 6 MW connection. Grid connection granted, grid connection agreement signed.
  • Chwalecice (Kłodawa) — plot 228, GPZ Enea Gorzów Słowiański, 0.5 ha, <5 km to connection point (an alternative <200 m location is in progress). 8.1 MW installed, 6 MW connection. Grid connection granted.
  • Mosina — plot 2776, GPZ Enea Mosina, 0.6 ha, ~0.85 km to connection point. 17.2 MW installed, 13 MW connection. Grid connection granted. Building Permit already obtained.
  • Środa Wielkopolska — plot 4038/2, GPZ Enea Środa Wielkopolska, 0.6 ha, ~1.9 km to connection point. 25 MW installed, 10 MW connection (Phase I), up to 30 MW (Phase II). Grid connection granted, grid connection agreement signed.
  • Śrem — plot 2467/16, GPZ Enea Śrem HCP, 1.37 ha, ~0.5 km to connection point. 25 MW installed, 10 MW connection (Phase I), up to 50 MW (Phase II). Grid connection granted.

Beyond this stand-alone pipeline, Nebo also controls a 100 MW hybrid PV+BESS project with grid connection already granted, plus a further c.900 MW of BESS projects at an earlier stage of development — available for discussion alongside this portfolio.

Available as a full portfolio or, potentially, split by site, with a minimum of 4 sites acquired. Asking price on request. Poland's grid connection framework changed in April 2026 (amended Energy Act) — connection conditions carry a limited validity window, which adds urgency for buyers evaluating this pipeline. Contact Nebo for the full data room: technical connection conditions, signed agreements where applicable, and site maps.

Posted 13 Aug 2026

Financial Overview

Asking price
Price on request

Grid Connection

Step 3 of 7 — Technical conditions received

1
2
3
4
5
6
7
Voltage
15 kV

Timeline

COD targetPlanned
Target Dec 2027

Contact details are hidden

Sign in to view contact information and send a message.

Email address
Send a message

Related listings

BESS:40 MWh/ 2h

20MW / 40MWh Battery Energy Storage Project – Leighton Hall, Cheshire, UK An opportunity to acquire a proposed 20MW / 40MWh (2-hour) Battery Energy Storage System (BESS) development located at Leighton Hall in Cheshire, England. Project Overview: Location: Leighton Hall, Cheshire, UK Power Capacity: 20MW Energy Storage Capacity: 40MWh Storage Duration: 2 hours Grid Connection: Proposed 33kV connection with SP Energy Networks, subject to the relevant connection works Planning: Planning permission granted for battery storage development Land: 25-year registered lease arrangement Opportunity: Acquisition of the project for further development

ProjectReady to Build
6 days ago
Wind park 149 mw -Bulgaria
Bulgaria · Burgas
Wind:149 MW

The seller. is offering development rights / a participation Wind Park, a 149 MW licensed wind project located in Burgas region in Bulgaria . The project has an electricity-production licence, secured land, approved detailed development plans, and historical permitting documentation.

ProjectPermittingBESS potential: 30–120 MWhCOD Q4 2029
1 week ago

Price on request

Project: SECI-ESS-IV — 800 MW / 3,200 MWh Standalone Battery Energy Storage Systems (India) Opportunity Overview An opportunity to explore participation in India’s utility-scale battery energy storage market through the SECI-ESS-IV procurement for 800 MW / 3,200 MWh of standalone Battery Energy Storage Systems (BESS). The tender represents a potential opportunity for qualified battery storage developers, technology providers, EPC contractors, infrastructure investors and energy storage solution providers seeking to participate in India’s expanding energy storage sector. Key Project Parameters * Country: India * Procurement: SECI-ESS-IV * Project type: Standalone Battery Energy Storage System * Aggregate power capacity: 800 MW * Aggregate storage capacity: 3,200 MWh * Storage duration: 4 hours * Engagement type: One-off tender opportunity Potential Participation Routes Depending on the applicable tender conditions, interested parties may explore participation through: * BESS technology and battery supply. * Engineering, procurement and construction (EPC). * Technical partnerships with eligible bidders. * Infrastructure investment and financing. * Joint ventures or consortium arrangements, where permitted. * Operations and maintenance services. Commercial Structure The applicable revenue model, tariff arrangements, project allocation, financing requirements, contractual obligations and investment returns must be assessed against the official tender documentation. The opportunity is being presented for preliminary market exploration. Interested parties should independently verify eligibility requirements, tender status, deadlines, technical specifications and commercial terms before committing resources. Next Steps Interested companies and investors can initiate a discussion to assess their suitability, identify potential participation routes and determine whether a consortium, technology partnership, EPC arrangement or investment structure is appropriate. Disclaimer: This listing describes a tender opportunity and does not represent ownership of an awarded project, a confirmed investment mandate, or a guaranteed contract.

ProjectConcept
2 weeks ago
BESS:150 MWh/ 3.13hSolar:49.8 MW

Hybrid PV + BESS project in Zakarpattia, the westernmost and safest region of Ukraine, about 9 km from the Romanian border. Zakarpattia also has the best solar irradiation among the western regions. The location was chosen deliberately for security and resource quality. **Project overview** - PV plant: 49.8 MW AC / 65.5 MWp DC - BESS: 48 MW AC / 150 MWh - Location: Zakarpattia region, about 9 km from the Romanian border - Grid: PJSC Zakarpattyaoblenergo (DSO), technical conditions received, permitted capacity 50 MW, connection line about 2.5 km - Land: 49-year lease - Permitting: construction permit expected in about two weeks (Ready-to-Build status to follow); construction documentation is being agreed with the DSO **Revenue model and forecast** - Electricity is sold on the day-ahead market (DAM) under a bilateral PPA with a trading company; trader margin 5% of the DAM price - Expected generation (PVsyst): 88,890 MWh per year, of which 82,244 MWh fed into the grid - Year-1 revenue forecast: UAH 494.8 million excl. VAT (about EUR 10.1 million at 48.98 UAH/EUR), based on actual DAM prices for Nov 2024 - Oct 2025 and the effect of the BESS on selling in the highest-price hours - Year-1 OPEX forecast: UAH 39.0 million excl. VAT (about EUR 0.8 million), including forecast imbalance costs **Investment** - Total CAPEX: EUR 48.9 million excl. VAT, including grid connection - PV plant construction: EUR 22.0 million; BESS construction: EUR 19.6 million; grid connection: EUR 7.3 million **Transaction** Sale of 100% of the project company (SPV); the developer is open to discussing a co-investment structure. Asking price on request. The full financial model and project documentation are available to qualified investors under NDA.

ProjectPermitting
2 weeks ago

Price on request