Wattilla

BESS Projects & Battery Storage Systems for Sale in Austria

8 listings in Austria — battery storage projects, BESS systems and services, searchable by capacity, power and stage. Part of Wattilla, the B2B marketplace for battery energy storage worldwide.

8 listings
0.2 GWh total BESS capacity listed
Operational: 2Ready to Build: 1

Energie Haus GmbH is an independent BESS and transformer consulting company headquartered in Vienna, Austria. We provide vendor-neutral technical advice, manufacturer access, and end-to-end project support for developers, utilities, and industrial clients worldwide. Services offered: - BESS Consulting: feasibility studies, system sizing, technology selection, supplier due diligence, contract support and project management - Transformer Solutions: technical specification, supplier matching, IEC compliance validation, grid integration support - Independent EPC / IPS Contracting: full project delivery as single point of contact - O&M Advisory: operations and maintenance guidance for commissioned systems We work with a curated network of certified European manufacturers: ASTOR (Turkey/Global), BEZ (Slovakia, est. 1902), and IPS/EXERON (Bulgaria, EU-manufactured, NATO approved). No vendor lock-in — we recommend the solution that fits your project. Track record: 162+ MW installed capacity, 230,000+ transformers worldwide, active in 59 countries. Clients: renewable energy developers, grid infrastructure owners, EPC contractors, utilities, C&I operators.

FeaturedBESS ConsultingTransformer SolutionsIPS Contracting
4 weeks ago

Price on request

⚠️TEST DATA — Not a real listing, for demonstration only

Independent BESS development and advisory firm based in Vienna. Services: site identification and screening, grid feasibility studies, revenue modelling, technology selection, procurement support, lender technical advisory (LTA). Served 30+ clients across Central Europe since 2019. Vendor-neutral approach — no equipment supply conflicts.

FeaturedBESS ConsultingFeasibility StudyTechnical Due Diligence
2 weeks ago
⚠️TEST DATA — Not a real listing, for demonstration only
🔋BESS:16 MWh/ 2h· LFP

Test listing (for demonstration only). 8 MW / 16 MWh containerised BESS system, LFP chemistry, ex-works Austria. Includes PCS, BMS, SCADA, CE certified. Available for immediate delivery.

1 week ago

Price on request

⚠️TEST DATA — Not a real listing, for demonstration only
🔋BESS:16 MWh/ 2h· LFP

Test listing (for demonstration only). 8 MW / 16 MWh containerised BESS system, LFP chemistry, ex-works Austria. Includes PCS, BMS, SCADA, CE certified. Available for immediate delivery.

1 week ago

Price on request

⚠️TEST DATA — Not a real listing, for demonstration only
🔋BESS:2 MWh/ 4h· LFP, off-grid capable

Compact microgrid BESS system for off-grid industrial sites, remote facilities and critical backup. Island-forming inverter, automatic load shedding, diesel genset interface. IP55 weatherproof enclosure. Suitable for telecom sites, mining operations and island resorts. Влада

2 weeks ago

€ 29000000

⚠️TEST DATA — Not a real listing, for demonstration only
🔋BESS:60 MWh/ 2h· LFP

Operational BESS in Styria participating in APG FCR and MARI markets. 2-year operational track record with >98% availability. Remote monitoring from Vienna. All O&M contracts transferable. Turn-key portfolio acquisition opportunity.

OperationalGrid: Energized
2 weeks ago

€18M

⚠️TEST DATA — Not a real listing, for demonstration only
💧Hydro:30 MW🔋BESS:20 MWh/ 2h· LFP

Run-of-river hydro plant with co-located BESS in Tyrol. Hydro has been operational for 12 years with stable water rights. BESS added in 2023 for APG FCR market participation. Combined revenue stream from hydro energy + grid services.

Operational
2 weeks ago

€ 38M

⚠️TEST DATA — Not a real listing, for demonstration only
🔋
25 MW / 100 MWh BESS — Austria
Austria · Lower Austria
🔋BESS:100 MWh/ 4h· LFP

Fully permitted BESS project in Lower Austria. Grid connection at 110 kV, APG congestion zone. Revenue strategy: FCR + MARI. EPC tender documents ready. Environmental permit obtained.

Ready to Build
2 weeks ago

€ 7.2M