Operational biogas cogeneration plant (25 MW thermal + 8 MW electric) with 5 MW BESS for FCR participation. EEG feed-in tariff running until 2030. Biogas feedstock contracts secured. BESS adds FCR revenue on top of stable EEG income.
€ 19M
Large onshore wind + BESS hybrid in Norrland. EIA submitted to Energimarknadsinspektionen. P50 yield 4,100 h/year in high-wind corridor. BESS for FCR-D and intraday arbitrage. Green electricity certificate (ELCERT) eligible.
On request
Solar + BESS hybrid in Wallonia. Elia grid connection study approved. CRE AESS grant application submitted. BESS for FCR and Elia strategic reserve. Strong support from regional government for renewable projects.
€ 8.5M
Ready-to-build large-scale solar + BESS hybrid in Murcia. RED ELÉCTRICA connection permit granted. PPA at 42 €/MWh agreed with industrial offtaker. BESS for peak shifting and ancillary services. All permits in hand, EPC tender launched.
€ 28M
BESS concept project in Slovenia. ELES pre-connection study requested. Revenue potential in FCR and cross-border arbitrage via Austrian interconnector. Small team, willing to co-develop or sell development rights.
—
BESS project near the Baltic coast, strategically positioned to absorb offshore wind curtailment from planned Polish offshore wind capacity. PSE grid connection study ongoing. Revenue model: FCR, aFRR + offshore wind balancing contract.
€ 20M
Small-scale but high-yielding BESS project in Bulgaria. ESO grid connection permit issued. Targeting FCR and aFRR revenues in Bulgarian balancing market. Attractive entry price with strong yield on investment.
€ 3.2M
Strategic BESS project addressing South Africa's loadshedding crisis. REIPPP Round 6 preferred bidder status. Eskom grid connection signed. Land secured in Northern Cape. Designed to provide spinning reserve and energy arbitrage during peak loadshedding periods.
On request
BESS project in Hokkaido, Japan. Hokkaido Electric Power grid application submitted. Targeting frequency containment reserve and capacity market revenues. Strong market need following grid stabilization requirements post Tomari NPP shutdown.
On request
Early-stage BESS development near Bratislava. SEPS grid connection pre-study complete. Targeting FCR and aFRR revenues. Proximity to Austrian interconnection creates additional arbitrage opportunities.
—
BESS development in Victoria. AEMO connection studies complete. Eligible for VDER (Victorian Default Export Rate) and LDES funding. Revenue stack: FCAS contingency, energy arbitrage, network support agreement with AEMO.
On request
BESS project in County Cork with EirGrid grid connection offer accepted. DS3 system services contract pre-qualified. Grid code compliant. Construction-ready following planning grant. Excellent revenue stack from FFR, DC, and RRS services.
€ 10.5M
BESS project under construction in Groningen. TenneT grid connection. FCR and aFRR contract pre-qualified. BOP complete, BESS containers arriving Q2 2025. COD expected H2 2025. Acquisition at construction stage available.
€ 43M
BESS development in Andalusia, Spain. REE grid connection application submitted. Targeting SRAD ancillary services market and arbitrage in Iberian market (MIBEL). High merchant revenue potential due to volatility from high renewable penetration.
€ 16M
Run-of-river hydro plant with co-located BESS in Tyrol. Hydro has been operational for 12 years with stable water rights. BESS added in 2023 for APG FCR market participation. Combined revenue stream from hydro energy + grid services.
€ 38M
Ready-to-build wind + BESS project in Finnish Lapland. EIA approved. Fingrid grid connection secured. P50 yield: 3,600 h/year. BESS for FCR-N and peak power management. Nordic CfD tender eligible.
€ 22M
Large-scale solar + BESS hybrid in California. CAISO interconnection agreement signed. ITC/IRA credits apply. 20-year PPA signed with a California utility. Ideal for a large infrastructure fund or utility acquisition.
$ 65M
Solar + BESS hybrid under construction in South Bohemia. Grid connection at 22 kV. Solar panels delivery on site. BESS planned for industrial peak shaving + FCR. COD expected Q4 2025.
€ 19M
Multi-technology hybrid project in Konya Province. YEKDEM feed-in tariff application submitted for solar and wind. BESS licensed separately. TEİAŞ grid study ongoing. Excellent wind and solar resource in the region.
On request
Operational wind + BESS hybrid in North Jutland. 4,100 full-load hours annually. BESS provides FCR-D and participates in Nordic balancing market. PPA signed for wind energy. Strong cash flows since 2022.