BESS Projects, Battery Systems & Energy Storage Services for Sale
76 active offers from sellers matching your filters
76 results— page 1 of 4
Project is fully RtB and construction can immediately start. Potential PPA secured for 5-8 years. Low grid connection cost no reinforcement
The budget is ready to build all permits in place including building permit cabling.
Project is fully ready to build including g land ownership. Grid connection contract signed including building permit. Grid connection cost 125000 euro.
20MW / 40MWh Battery Energy Storage Project – Leighton Hall, Cheshire, UK An opportunity to acquire a proposed 20MW / 40MWh (2-hour) Battery Energy Storage System (BESS) development located at Leighton Hall in Cheshire, England. Project Overview: Location: Leighton Hall, Cheshire, UK Power Capacity: 20MW Energy Storage Capacity: 40MWh Storage Duration: 2 hours Grid Connection: Proposed 33kV connection with SP Energy Networks, subject to the relevant connection works Planning: Planning permission granted for battery storage development Land: 25-year registered lease arrangement Opportunity: Acquisition of the project for further development
The seller. is offering development rights / a participation Wind Park, a 149 MW licensed wind project located in Burgas region in Bulgaria . The project has an electricity-production licence, secured land, approved detailed development plans, and historical permitting documentation.
Project: SECI-ESS-IV — 800 MW / 3,200 MWh Standalone Battery Energy Storage Systems (India) Opportunity Overview An opportunity to explore participation in India’s utility-scale battery energy storage market through the SECI-ESS-IV procurement for 800 MW / 3,200 MWh of standalone Battery Energy Storage Systems (BESS). The tender represents a potential opportunity for qualified battery storage developers, technology providers, EPC contractors, infrastructure investors and energy storage solution providers seeking to participate in India’s expanding energy storage sector. Key Project Parameters * Country: India * Procurement: SECI-ESS-IV * Project type: Standalone Battery Energy Storage System * Aggregate power capacity: 800 MW * Aggregate storage capacity: 3,200 MWh * Storage duration: 4 hours * Engagement type: One-off tender opportunity Potential Participation Routes Depending on the applicable tender conditions, interested parties may explore participation through: * BESS technology and battery supply. * Engineering, procurement and construction (EPC). * Technical partnerships with eligible bidders. * Infrastructure investment and financing. * Joint ventures or consortium arrangements, where permitted. * Operations and maintenance services. Commercial Structure The applicable revenue model, tariff arrangements, project allocation, financing requirements, contractual obligations and investment returns must be assessed against the official tender documentation. The opportunity is being presented for preliminary market exploration. Interested parties should independently verify eligibility requirements, tender status, deadlines, technical specifications and commercial terms before committing resources. Next Steps Interested companies and investors can initiate a discussion to assess their suitability, identify potential participation routes and determine whether a consortium, technology partnership, EPC arrangement or investment structure is appropriate. Disclaimer: This listing describes a tender opportunity and does not represent ownership of an awarded project, a confirmed investment mandate, or a guaranteed contract.
Hybrid PV + BESS project in Zakarpattia, the westernmost and safest region of Ukraine, about 9 km from the Romanian border. Zakarpattia also has the best solar irradiation among the western regions. The location was chosen deliberately for security and resource quality. **Project overview** - PV plant: 49.8 MW AC / 65.5 MWp DC - BESS: 48 MW AC / 150 MWh - Location: Zakarpattia region, about 9 km from the Romanian border - Grid: PJSC Zakarpattyaoblenergo (DSO), technical conditions received, permitted capacity 50 MW, connection line about 2.5 km - Land: 49-year lease - Permitting: construction permit expected in about two weeks (Ready-to-Build status to follow); construction documentation is being agreed with the DSO **Revenue model and forecast** - Electricity is sold on the day-ahead market (DAM) under a bilateral PPA with a trading company; trader margin 5% of the DAM price - Expected generation (PVsyst): 88,890 MWh per year, of which 82,244 MWh fed into the grid - Year-1 revenue forecast: UAH 494.8 million excl. VAT (about EUR 10.1 million at 48.98 UAH/EUR), based on actual DAM prices for Nov 2024 - Oct 2025 and the effect of the BESS on selling in the highest-price hours - Year-1 OPEX forecast: UAH 39.0 million excl. VAT (about EUR 0.8 million), including forecast imbalance costs **Investment** - Total CAPEX: EUR 48.9 million excl. VAT, including grid connection - PV plant construction: EUR 22.0 million; BESS construction: EUR 19.6 million; grid connection: EUR 7.3 million **Transaction** Sale of 100% of the project company (SPV); the developer is open to discussing a co-investment structure. Asking price on request. The full financial model and project documentation are available to qualified investors under NDA.
Progetto BESS in vendita – 8 MW / 40 MWh – Calabria, Italia Si presenta un'opportunità di investimento per l'acquisizione di un progetto di sistema di accumulo di energia a batteria (BESS) situato a Castrovillari, in Calabria, nel Sud Italia. Panoramica del progetto: Tecnologia: Sistema di accumulo di energia a batteria (BESS) Potenza installata: 8 MW Capacità di accumulo energetico: 40 MWh Durata di conservazione: 5 ore Località: Castrovillari, Calabria, Italia Fase del progetto: Pronto per la costruzione (RTB) Quadro normativo: mercato elettrico italiano, con riferimento al quadro MACSE. Struttura della transazione: Il proprietario del progetto è disponibile a cedere una quota compresa tra il 50% e il 100% del progetto, inclusa una potenziale acquisizione tramite la Special Purpose Vehicle (SPV) del progetto. Si prevede che il processo di transazione includa: Manifestazione iniziale di interesse da parte di investitori qualificati. Stipula di un accordo di non divulgazione (NDA). Accesso alla documentazione tecnica, normativa e commerciale disponibile. Due diligence tecnica, legale e finanziaria. Presentazione e negoziazione di un'offerta vincolante. Esecuzione degli accordi transazionali e chiusura dell'operazione. Ulteriore documentazione e informazioni commerciali saranno fornite agli investitori qualificati su richiesta. Sono benvenute le manifestazioni di interesse da parte di fondi infrastrutturali, investitori in energie rinnovabili, società di servizi pubblici e sviluppatori internazionali di sistemi di accumulo energetico.
Ready-to-build standalone BESS in Central Romania, 400 MW / 825.4 MWh (~2h). Grid: Technical Connection Permit (ATR) issued by Transelectrica (TSO) in September 2025, with grid connection agreement signed. Direct connection to the 400 kV busbars of a 400/220/110 kV TSO substation via ~0.5 km underground cable. No reinforcements from the TSO development plan required. Approved export 379.45 MW / import 420.55 MW. Permits: building permit issued December 2025; technical expertise and TSO/DSO site permits in place. Land: ~1.6 ha, secured via lease and notarized sale-purchase promise. Transaction: sale of 100% of SPV shares. Full data room available under NDA.
# INVESTMENT OPPORTUNITY – ## ENERGOSOLAR SRL, ROMANIA 100% of the shares in **ENERGOSOLAR SRL** are offered for sale. The company holds a **Solar + BESS project** located in Totești, Hunedoara County, Romania. - **BESS capacity:** 11.132 MWh - **Maximum export capacity:** 4.4 MW - **Land:** 42,146 sqm, secured by superficies rights - **Existing documentation:** Superficies Agreement, Urban Planning Certificate and Grid Connection Solution Study - **The grid connection procedure is to be continued by the buyer** **Asking price for 100% of ENERGOSOLAR SRL shares: EUR 30,000.** Full documentation is available to interested investors for due diligence. **Contact:** Pop Veronica **E-mail:** veronica.pop@agriconsilier.ro
This is a separate, earlier-stage opportunity from NEBO (nebo.energy), distinct from NEBO's 93.5 MW / 7-site ready-to-sign BESS portfolio listed separately on Wattilla. Beyond that named portfolio, NEBO controls a further pipeline of approximately 900 MW of BESS projects across Poland, at an earlier stage of development. No site plots, GPZ substations, distances or confirmed grid connection dates have been disclosed for this part of the pipeline. This opportunity is intended for buyers or developers looking to acquire an active BESS development pipeline in the Polish market ahead of technical conditions and grid connection applications, rather than a specific, itemised set of sites. Given the early stage and lack of site-level disclosure, interested buyers should contact NEBO directly for a fuller briefing, likely under NDA.
NEBO (nebo.energy) is a Warsaw-based renewable energy developer with over 7 years of market experience and more than 2.5 GW of total capacity developed across photovoltaic, wind and energy storage projects. In 2023 Nebo sold a 100 MW / 16-project solar PV portfolio to hep Global (Germany), continuing its development to Ready-to-Build stage under a development service agreement — a track record directly relevant to the type of transaction offered here. This listing offers a portfolio of 7 stand-alone battery energy storage (BESS) development sites across Poland, presented together as a single opportunity. Combined installed power of 93.5 MW with 50 MW of grid connection capacity already secured for charging and discharging. Land is controlled at every site and grid connection conditions have been granted at all 7; at 3 of the 7 (Śmigiel, Bydgoszcz, Środa Wielkopolska), Nebo has already progressed to a signed grid connection agreement — the stronger bankability milestone. Storage duration is configurable at each site, either 2h or 4h. Every site connects into a 110/15kV GPZ substation operated by Enea or Energa, with the project itself connecting at the 15kV side. Target commercial operation date is Q3–Q4 2027, with a maximum deadline of Q4 2028 under the Grid Connection Agreement. Site-by-site overview: - Śmigiel — plot 91/4, GPZ Enea Śmigiel, 0.5 ha, ~110 m to connection point. 8.1 MW installed, 3 MW connection (Phase I), up to 20 MW (Phase II). Grid connection granted, grid connection agreement signed. - Tuczki — plot 150, GPZ Energa Tuczki, 0.98 ha, <0.5 km to connection point. 2 MW installed, 2 MW connection. Grid connection granted. - Bydgoszcz — plot 12/13, GPZ Enea Bydgoszcz, 1 ha, 400 m to connection point. 8.1 MW installed, 6 MW connection. Grid connection granted, grid connection agreement signed. - Chwalecice (Kłodawa) — plot 228, GPZ Enea Gorzów Słowiański, 0.5 ha, <5 km to connection point (an alternative <200 m location is in progress). 8.1 MW installed, 6 MW connection. Grid connection granted. - Mosina — plot 2776, GPZ Enea Mosina, 0.6 ha, ~0.85 km to connection point. 17.2 MW installed, 13 MW connection. Grid connection granted. Building Permit already obtained. - Środa Wielkopolska — plot 4038/2, GPZ Enea Środa Wielkopolska, 0.6 ha, ~1.9 km to connection point. 25 MW installed, 10 MW connection (Phase I), up to 30 MW (Phase II). Grid connection granted, grid connection agreement signed. - Śrem — plot 2467/16, GPZ Enea Śrem HCP, 1.37 ha, ~0.5 km to connection point. 25 MW installed, 10 MW connection (Phase I), up to 50 MW (Phase II). Grid connection granted. Beyond this stand-alone pipeline, Nebo also controls a 100 MW hybrid PV+BESS project with grid connection already granted, plus a further c.900 MW of BESS projects at an earlier stage of development — available for discussion alongside this portfolio. Available as a full portfolio or, potentially, split by site, with a minimum of 4 sites acquired. Asking price on request. Poland's grid connection framework changed in April 2026 (amended Energy Act) — connection conditions carry a limited validity window, which adds urgency for buyers evaluating this pipeline. Contact Nebo for the full data room: technical connection conditions, signed agreements where applicable, and site maps.
Early-stage BESS development near Brno. ČEPS pre-connection study initiated. Revenue model: FCR and secondary reserve (mFRR) in Czech balancing market. Land option signed for 25 years. Development rights for sale or co-development welcome.
Large solar + BESS hybrid project in Sicily. Terna grid connection study completed with technical conditions received. GHI irradiation > 1,900 kWh/m². BESS provides MSD ancillary services and island grid frequency support. Environmental permit submission Q2 2026.
Operational BESS in Styria participating in APG FCR and MARI markets. 2-year operational track record with >98% availability. Remote monitoring from Vienna. All O&M contracts transferable. Turn-key portfolio acquisition opportunity.
Fully permitted 50 MW / 200 MWh BESS project in Brandenburg, Germany. Grid connection agreement signed with 50Hertz at 110 kV. FCR and aFRR pre-qualification documents ready. EPC tender launched. Environmental permit obtained. Excellent revenue stack in German balancing market.
BESS development project targeting CAMMESA ancillary services market. ENRE grid pre-study initiated. High price volatility in Argentine wholesale market creates strong arbitrage case. USD-denominated revenue potential from MATER market.
Large-scale BESS in PJM territory. Interconnection study in progress. Revenue: PJM capacity market (RPM), regulation (RegD), energy arbitrage. IRA ITC investment tax credit applies. PJM has highest capacity prices in North America.
BESS project in Malta's island grid. ARMS/Enemalta grid study approved. Critical for island grid stability. Eligible for EU Island Territories Initiative grants. Revenue: frequency regulation + island grid balancing. Unique island grid premium.
Large BESS project in Silesia, strategically positioned to support industrial load centers undergoing coal phase-out. PSE grid connection at 220 kV. FCR and aFRR pre-qualification completed. Capacity market contract signed.