Energy Storage & Renewables Marketplace
Buy, sell and source energy projects, BESS systems and services — any technology, worldwide.
9 results
Specialist regulatory advisory firm covering grid connection permitting, BImSchG environmental approval, and energy storage regulation in Germany, Austria and Switzerland. Deep knowledge of §14a EnWG, NABEG grid expansion, network charges for storage. Track record: 50+ successful grid connection applications. Fixed-fee and retainer engagements available.
Full-service EPC contractor specializing in utility-scale BESS projects across Europe. Track record: 800 MWh delivered in last 3 years. Services: civil works, MV/HV electrical installation, BESS container installation, grid connection works, SCADA integration, grid code compliance testing, FCR/aFRR pre-qualification. Bankable contracts with performance bonds. ISO 9001 certified.
Complete 10 MW / 40 MWh BESS system available from European stock. LFP chemistry in 20ft HV containers (2.5 MWh per unit). Includes BMS, PCS, MV transformer, protection relays and SCADA. CE certified. Factory acceptance tests passed. Delivery within 4 weeks. Ideal for FCR, C&I peak shaving or island grid.
Fully permitted 50 MW / 200 MWh BESS project in Brandenburg, Germany. Grid connection agreement signed with 50Hertz at 110 kV. FCR and aFRR pre-qualification documents ready. EPC tender launched. Environmental permit obtained. Excellent revenue stack in German balancing market.
Operational biogas cogeneration plant (25 MW thermal + 8 MW electric) with 5 MW BESS for FCR participation. EEG feed-in tariff running until 2030. Biogas feedstock contracts secured. BESS adds FCR revenue on top of stable EEG income.
Independent technical due diligence for BESS asset acquisitions and financing. Scope: technology review, state-of-health assessment, grid contract analysis, revenue forecast validation, capex/opex benchmarking. Lender and equity mandates. >30 transactions completed.
Comprehensive O&M services for BESS assets across Europe. 24/7 remote monitoring, preventive and corrective maintenance, cell replacement, BMS and EMS updates. SLA-backed response times. Currently managing 1.2 GWh of assets across 8 countries. Minimum 10 MW per contract.
10 MW / 40 MWh long-duration BESS (4h) for peak shifting and arbitrage applications. LFP chemistry with cycle life > 6,000 cycles at 80% DoD. Modular 2.5 MWh containers. Full integration with SCADA and energy management system.
Complete 20 MW / 40 MWh BESS system available from stock. LFP chemistry in 20ft standard containers. Includes BMS, PCS, MV transformer and SCADA. CE certified. Can be delivered within 6 weeks. Suitable for FCR, industrial peak shaving or island grid.