BESS Projects, Battery Systems & Energy Storage Services for Sale
118 active offers from sellers — BESS & hybrid projects, battery systems and services for sale worldwide
118 listings found— page 2 of 6
KAIRA ENERGY is a German BESS solutions provider supplying modular LFP battery energy storage systems for commercial, industrial and utility-scale projects across Europe. We combine German-based customer and project support with international BESS experience, including projects in markets such as Brazil and Taiwan. Available system sizes range from approximately 261 kWh up to 80 MWh and beyond, depending on project requirements. The systems are modular and expandable, allowing power and energy capacity to be configured according to the specific application. Indicative system pricing starts from approximately €140/kWh, depending on system size, configuration, PCS/EMS scope, certifications, delivery terms and project requirements. We support project developers, EPCs, investors and asset owners with system supply, technical coordination, logistics and project-specific configuration. Please contact us with your required power, capacity and project location for a tailored technical and commercial proposal.
NGE (Next Generation Energy Tech Co., Ltd) is a China-based lithium battery solution provider and battery integration supplier, active in eMobility, marine, energy storage (ESS), industrial and recreational applications for over 10 years. - Full manufacturing stack: cells (Prismatic LFP/NMC, cylindrical, pouch, sodium-ion), modules, and finished packs/racks — including containerized/rack C&I ESS systems, marine power packs and racks (DNV/BV/CCS/ABS type-approved), and NMC power packs - Partners with tier-1 cell manufacturers (EVE, Rept-Battero, CALB, Svolt) and customizes structure and integration for different markets - ISO 9001 and ISO 14001 certified; products carry UN38.3, MSDS, IEC, UL, RoHS compliance (cell level), IP20–IP67 enclosure ratings, C5 corrosion protection and CCS/BV/DNV/ABS type approval on marine packs and racks - Exports to Europe, North America, Africa and beyond; branches in Shanghai and City of Industry, CA (US); factories in Jiaxing and Luoyang, China Product range spans single cells (22–668Ah LFP prismatic, 5.45–169Ah NMC prismatic, plus cylindrical, pouch and sodium-ion) up to containerized C&I ESS packs (13–104kWh per pack, fan or liquid cooled) and marine battery racks (up to ~268kWh, 864V, type-approved). Exact ratings, chemistry and configuration are built to each project's specification. Contact us for a technical proposal, datasheets and pricing for your specific capacity, chemistry and application (eMobility, marine, industrial, ESS).
# INVESTMENT OPPORTUNITY – ## ENERGOSOLAR SRL, ROMANIA 100% of the shares in **ENERGOSOLAR SRL** are offered for sale. The company holds a **Solar + BESS project** located in Totești, Hunedoara County, Romania. - **BESS capacity:** 11.132 MWh - **Maximum export capacity:** 4.4 MW - **Land:** 42,146 sqm, secured by superficies rights - **Existing documentation:** Superficies Agreement, Urban Planning Certificate and Grid Connection Solution Study - **The grid connection procedure is to be continued by the buyer** **Asking price for 100% of ENERGOSOLAR SRL shares: EUR 30,000.** Full documentation is available to interested investors for due diligence. **Contact:** Pop Veronica **E-mail:** veronica.pop@agriconsilier.ro
Shandong Ruisite supplies configurable battery energy storage systems for utility, commercial and industrial applications. - Containerized and modular BESS solutions - Integrated battery, BMS, PCS and thermal management architecture - Supporting transformers, substations and switchgear available for complete power-system integration - Project-specific engineering and global delivery support System ratings and commercial terms are configured according to project requirements. Visit our website for the product range and contact us for a technical proposal.
LSG Group GmbH (LSG Building Solutions) is a privately owned, multi-domestic engineering and construction group headquartered in Vienna, Austria, ~400 employees, permanent operations in Austria, Croatia, Romania, Bulgaria, Serbia, Macedonia and Moldova. Full life-cycle EPC partner: consulting, project development, design, construction, O&M. Track record — BESS & hybrid power plant projects: - Izvoarele 2 HPP, Romania, 2026 — 160 MWh BESS (LFP) + 50 MW PV — EPC. >€20M investment, grid ancillary services (FCR/aFRR/mFRR) for Romania's TSO. - BESS Senyo, Hungary, 2024–2025 — 115 MWh BESS (40→115 MWh expansion) + 20 MWp PV — EPC. BESS containers by HITHIUM. - Glyptodon / CEM Carani HPP, Romania, 2024–2025 — 68.8 MWh BESS + 56 MWp PV — EPC. First hybrid power plant of its kind in Romania, currently in aFRR qualification. Beyond BESS, LSG has delivered 60+ solar PV projects since 2011 across Austria, Hungary, Bulgaria, Romania and beyond, totaling over 2,100 GWh of installed renewable generation. Vendor-neutral — worked with multiple battery suppliers (Trina Storage, HITHIUM). Open to EPC, engineering and O&M mandates on BESS and hybrid projects across Europe.
This is a separate, earlier-stage opportunity from NEBO (nebo.energy), distinct from NEBO's 93.5 MW / 7-site ready-to-sign BESS portfolio listed separately on Wattilla. Beyond that named portfolio, NEBO controls a further pipeline of approximately 900 MW of BESS projects across Poland, at an earlier stage of development. No site plots, GPZ substations, distances or confirmed grid connection dates have been disclosed for this part of the pipeline. This opportunity is intended for buyers or developers looking to acquire an active BESS development pipeline in the Polish market ahead of technical conditions and grid connection applications, rather than a specific, itemised set of sites. Given the early stage and lack of site-level disclosure, interested buyers should contact NEBO directly for a fuller briefing, likely under NDA.
NEBO (nebo.energy) is a Warsaw-based renewable energy developer with over 7 years of market experience and more than 2.5 GW of total capacity developed across photovoltaic, wind and energy storage projects. In 2023 Nebo sold a 100 MW / 16-project solar PV portfolio to hep Global (Germany), continuing its development to Ready-to-Build stage under a development service agreement — a track record directly relevant to the type of transaction offered here. This listing offers a portfolio of 7 stand-alone battery energy storage (BESS) development sites across Poland, presented together as a single opportunity. Combined installed power of 93.5 MW with 50 MW of grid connection capacity already secured for charging and discharging. Land is controlled at every site and grid connection conditions have been granted at all 7; at 3 of the 7 (Śmigiel, Bydgoszcz, Środa Wielkopolska), Nebo has already progressed to a signed grid connection agreement — the stronger bankability milestone. Storage duration is configurable at each site, either 2h or 4h. Every site connects into a 110/15kV GPZ substation operated by Enea or Energa, with the project itself connecting at the 15kV side. Target commercial operation date is Q3–Q4 2027, with a maximum deadline of Q4 2028 under the Grid Connection Agreement. Site-by-site overview: - Śmigiel — plot 91/4, GPZ Enea Śmigiel, 0.5 ha, ~110 m to connection point. 8.1 MW installed, 3 MW connection (Phase I), up to 20 MW (Phase II). Grid connection granted, grid connection agreement signed. - Tuczki — plot 150, GPZ Energa Tuczki, 0.98 ha, <0.5 km to connection point. 2 MW installed, 2 MW connection. Grid connection granted. - Bydgoszcz — plot 12/13, GPZ Enea Bydgoszcz, 1 ha, 400 m to connection point. 8.1 MW installed, 6 MW connection. Grid connection granted, grid connection agreement signed. - Chwalecice (Kłodawa) — plot 228, GPZ Enea Gorzów Słowiański, 0.5 ha, <5 km to connection point (an alternative <200 m location is in progress). 8.1 MW installed, 6 MW connection. Grid connection granted. - Mosina — plot 2776, GPZ Enea Mosina, 0.6 ha, ~0.85 km to connection point. 17.2 MW installed, 13 MW connection. Grid connection granted. Building Permit already obtained. - Środa Wielkopolska — plot 4038/2, GPZ Enea Środa Wielkopolska, 0.6 ha, ~1.9 km to connection point. 25 MW installed, 10 MW connection (Phase I), up to 30 MW (Phase II). Grid connection granted, grid connection agreement signed. - Śrem — plot 2467/16, GPZ Enea Śrem HCP, 1.37 ha, ~0.5 km to connection point. 25 MW installed, 10 MW connection (Phase I), up to 50 MW (Phase II). Grid connection granted. Beyond this stand-alone pipeline, Nebo also controls a 100 MW hybrid PV+BESS project with grid connection already granted, plus a further c.900 MW of BESS projects at an earlier stage of development — available for discussion alongside this portfolio. Available as a full portfolio or, potentially, split by site, with a minimum of 4 sites acquired. Asking price on request. Poland's grid connection framework changed in April 2026 (amended Energy Act) — connection conditions carry a limited validity window, which adds urgency for buyers evaluating this pipeline. Contact Nebo for the full data room: technical connection conditions, signed agreements where applicable, and site maps.
Test listing (for demonstration only). 8 MW / 16 MWh containerised BESS system, LFP chemistry, ex-works Austria. Includes PCS, BMS, SCADA, CE certified. Available for immediate delivery.
Test listing (for demonstration only). 8 MW / 16 MWh containerised BESS system, LFP chemistry, ex-works Austria. Includes PCS, BMS, SCADA, CE certified. Available for immediate delivery.
Energy storage finance advisory boutique. Services: debt structuring for BESS projects (senior, mezzanine), equity placement, revenue contract review, lender technical advisory, financial model audit. Closed €320M in storage financings across EU. Network includes 15+ active infrastructure lenders with storage mandates. Mandates from 20 MW upwards.
Specialist regulatory advisory firm covering grid connection permitting, BImSchG environmental approval, and energy storage regulation in Germany, Austria and Switzerland. Deep knowledge of §14a EnWG, NABEG grid expansion, network charges for storage. Track record: 50+ successful grid connection applications. Fixed-fee and retainer engagements available.
Specialist BESS O&M provider with 1.8 GWh under management across UK and EU. Services: 24/7 remote monitoring and dispatch, preventive and corrective maintenance, cell and module replacement, BMS/EMS firmware updates, performance reporting. SLA-backed 4-hour response for critical faults. Vendor-agnostic platform supports all major BESS OEMs.
Full-service EPC contractor specializing in utility-scale BESS projects across Europe. Track record: 800 MWh delivered in last 3 years. Services: civil works, MV/HV electrical installation, BESS container installation, grid connection works, SCADA integration, grid code compliance testing, FCR/aFRR pre-qualification. Bankable contracts with performance bonds. ISO 9001 certified.
Independent BESS development and advisory firm based in Vienna. Services: site identification and screening, grid feasibility studies, revenue modelling, technology selection, procurement support, lender technical advisory (LTA). Served 30+ clients across Central Europe since 2019. Vendor-neutral approach — no equipment supply conflicts.
Refurbished 5 MW / 10 MWh BESS with Grade A cells sourced from operational asset decommission. Full cell capacity testing performed (SOH > 92%). Inverter firmware updated to latest version. BMS recalibrated. Remaining OEM warranty 2 years. Full inspection and test report available on request. Significant saving vs. new.
Compact microgrid BESS system for off-grid industrial sites, remote facilities and critical backup. Island-forming inverter, automatic load shedding, diesel genset interface. IP55 weatherproof enclosure. Suitable for telecom sites, mining operations and island resorts. Влада
Turnkey 50 MW / 100 MWh BESS system ready for delivery. Grid-forming capable inverters. Includes 33/11 kV transformer package, arc flash protection and SCADA with remote monitoring. Type certificates available (EREC G99, IEC 62933). Modular design — can be split into 10 MW blocks. Full documentation included.
Commercial & industrial BESS system, 1 MW / 4 MWh in indoor rack-mounted cabinets. Designed for office buildings, logistics hubs and retail. Smart EMS with peak demand management, time-of-use optimization and demand response. Plug-and-play LV connection. 10-year performance warranty.
Complete 10 MW / 40 MWh BESS system available from European stock. LFP chemistry in 20ft HV containers (2.5 MWh per unit). Includes BMS, PCS, MV transformer, protection relays and SCADA. CE certified. Factory acceptance tests passed. Delivery within 4 weeks. Ideal for FCR, C&I peak shaving or island grid.
Early-stage BESS development near Brno. ČEPS pre-connection study initiated. Revenue model: FCR and secondary reserve (mFRR) in Czech balancing market. Land option signed for 25 years. Development rights for sale or co-development welcome.